Roadmaps / STM32 / Success criteria at Week 16

Reference

Success criteria at Week 16

Core path only. Optional work and the work version are extra.

  • Checkpoint 1 passes with its capture table and flagged seeded stall.
  • Checkpoint 2 passes with the step, disturbance and three-design latency evidence, and ADR-2.
  • Checkpoint 3 passes with the fuzz log, the safe-state capture and four decoded fault records.
  • Checkpoint 4 passes with the 20-row cut table, the soak report, the rollback log and the identical-build check.
  • The repository README opens with the scenario and its numbers, and ADRs 1 to 5 each name a rejected option (6 and 7 for Senior and above).
  • One other engineer has scored your checkpoints, or you have posted them and capped your self-score at 2.