Roadmaps / Embedded Linux / Success criteria at Week 16
Reference
Success criteria at Week 16
Core path only. Optional work and the work version are extra.
- Checkpoint 1 passes with the two-build diff, the pin check and its failure on the seeded fault.
- Checkpoint 2 passes with the option table, the probe capture and the wrong-match check.
- Checkpoint 3 passes with the 100-trial table, the per-stage rule-of-three statement, the tamper captures and the health-check revert.
- Checkpoint 4 passes with the SBOM, the CVE report (statuses and reasons, kernel triage by policy), the rollout log with a halted unit, the ten-year support timeline and the advisory timestamps.
- The repository README opens with the scenario and its numbers, and ADRs 1 to 5 each name a rejected option (6 and 7 for Senior).
- One other engineer has scored your checkpoints, or you have posted them and capped your self-score at 2.